Skip to content

Factory Evidence Hub

Proof Center —Everything We Claim, Filed Here

One page that maps every claim on this site to its evidence: the registered entity behind the factory, certificates with scope, the machines that do the work, and the batch records that survive each production run.

Straight answer

The claim-to-evidence chain is: every statement on this site is backed by a registration, a certificate, a machine, a document or a test record — and each of those can be reviewed. Neptunor is the boat product development and manufacturing division of Neptunor, the manufacturing division of Neptunor Marine Co., Ltd. (registered in Qingdao since 2012). The 18,000 m² plant operates under ISO 9001:2015 quality management; ISO 6185, CE conformity, BSCI and REACH/RoHS documentation is reviewed according to the applicable model, configuration and order scope. Every inflatable chamber is tested at 0.35 bar for 24 hours with auto-reject above 0.02 bar drop, and batch records are kept under 10-year ERP traceability. The paper trail is published or shareable, and the factory itself is audit-open.

Specifications verified: 2026-08

Who Is Behind The Factory

Three Names, One Legal Chain —Nothing Hidden

The sales side, the manufacturing division and the legal entity are one chain you can follow from the website to the company register.

18,000 m²
One factory floor
4 specialized workshops, open to audits
300+
Workers on site
25+ engineers in R&D, materials and QC
Up to 60,000
Boats per year
~5,000 boats/month on 4 automated lines
40+
Countries served
Europe, Americas, APAC, Middle East
7-stage
Inspection gate system
Node 01–07, recorded per serial number
10 years
ERP batch traceability
Batch records kept and linked per lot

Certificates & Scope

What We Hold, What It Covers, How It Is Verified

The published list —never "available on request only". Certificate numbers and audit records are supplied on request or during an audit.

The published list —never "available on request only". Certificate numbers and audit records are supplied on request or during an audit.

Where The Evidence Lives

Evidence Folders —Opened For Inspection

Each folder is a live page you can review now, plus files that travel with your order.

A Batch, Followed From Roll To Boat

What Traceability Actually Looks Like

Every batch is issued a 10-year ERP lot code. The chain recorded under one lot:

  • Incoming roll — material certificate, roll number, fabric batch tested (tensile, tear, seam)
  • Cutting — CNC nesting job vs design file, waste percentage logged
  • Welding & lamination — line, operator, machine parameters per chamber
  • Assembly — boat serial number, valve type, EVA decking lot
  • Test — 0.35 bar × 24 h hold per chamber, auto-reject above 0.02 bar drop
  • Release — 120-point checklist per boat, QA Director sign-off per batch
  • Onward — Certificate of Conformance with the shipment; audit right reserved in the contract

Ask for the sample QC record before your first order — it is the same format you receive with your shipment.

FAQ

Evidence Questions Buyers Ask

Is this page for verification only, and not replacing due diligence?+

Correct — this page shows where every claim can be verified: entity registration, certificates, machines, records and an audit-open plant. Your usual due-diligence steps (registration check, audit, third-party inspection) still apply and are welcome.

Orders are placed with Neptunor Marine Co., Ltd., operating as Neptunor (manufacturing division), with Neptunor as the boat product line. Contract documents are signed by the Sales VP, the Chief Engineer and the QA Director.

Yes — certificate numbers and audit records are supplied on request or during an audit. The list is published, never "available on request only".

Every chamber is tested at 0.35 bar for 24 hours with auto-reject above 0.02 bar drop; test logs link to serial numbers and ship with the Certificate of Conformance per batch. SGS, TÜV, BV or Intertek pre-shipment inspection per ISO 2859-1 Level II can be scheduled at your choice.

REACH/RoHS material documentation applies to boats and accessories supplied in the same order, and QC checklists cover the complete kit — boat, oars, pump, repair kit and bag.

ERP batch traceability is kept for 10 years. QMS SOPs and inspection standards stay downloadable, and the buyer reserves an audit right during production per the contract.

Verify First —Then Let’s Talk Specs

Ask for the registration pack, certificate copies or an audit slot. Verification comes first; the order conversation follows. Submitting an inquiry does not commit you to an order.